Skip to content
usona exterior interior-1

Usona Institute Project Update

Surrounded by glulam beams and cross-laminated timber panels, the interior of the Usona Institute Center of Research Project is starting to take shape. Exterior windows are finishing up soon while the stained cedar siding continues to be installed on the 2nd story of the building. The rough carpentry framing and drywall applications are ongoing throughout the building with interior finishes such as painting, wood paneling, glazing, flooring, stone masonry, and acoustical ceiling grid starting up. MEP systems are being put in place while the therapy pool area rough-in has started, all on track for a late summer completion.

Ryan Kraemer

President

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.